What a Tipple build looks like

New construction, framing, roof structure, exterior envelope, finish carpentry, and the rooms people actually live in. This is the range of work we take on and the standard we hold it to.

We also pride ourselves on the renovation work we do and this is what we’re known for being good at in the industry. Existing structures shift and change with time, but giving the bones of someone’s home the support and upgrades it needs is where we thrive.

Every house we take on runs the same sequence, and every stage is worth seeing. Everything below is our own work, photographed on our own sites.

A new two-storey house wrapped and closed in, its verandah framed the length of the front.
New build

Closed in before the weather turned

Two storeys framed, sheathed, and weather tight, with the verandah run the full width of the front. Once a house is closed in and dry, the rest of the job stops fighting the forecast.

A poured foundation, waterproofed and backfilled, on a cut lot of red earth.
Foundations

Poured, sealed, backfilled

The whole house is a copy of this layout. We square it, check it, and check it again before anything gets poured. Then it gets waterproofed before a scrap of backfill goes near it.

First-floor walls standing on a new foundation, with sheathing and framing stock stacked alongside.
Framing

Walls up

Plumb, straight, blocked where it needs blocking. The week the drawings turn into rooms you can walk.

Open-web floor trusses set and braced overhead, seen from the subfloor of a house being framed.
Framing

Floor system and floor joists

Set on layout, braced properly, and sheathed the same week whenever the weather lets us.

A freshly shingled hip roof with the ridge cap run out to the end.
Roofing

Shingled and shut to the weather

Ridge cap run out to the end, valleys and flashings done properly. Roofs are judged in year eight, not on handover day.

Cedar shingle siding coursed around a round porthole window under a raking roof line.
Envelope

Cedar shingle work

Coursed by hand and cut in around the openings. Cedar is the cladding that looks better in year ten than it does in year one.

A cedar deck and ramp with black spindle railing, built off the back of a bungalow.
Decks

Deck, stairs and ramp

Framed off its own posts and footings, railed in black spindle, and laid out so the ramp reads as part of the deck rather than an apology bolted on the end.

A Camo hidden-fastener tool sitting on a run of freshly laid cedar deck boards.
Decks

Not a screw head in sight

Cedar decking fastened from the edge with a Camo tool, so the boards go down clean. Nothing to catch a bare foot and nothing to rust a ring into the wood.

A stair hall with painted panelled wainscot and trim, oak treads and a herringbone floor.
Painting

High quality paints

We’re happy to provide our clients with paint selections that vary from affordable and trusted to higher quality finishes depending on the budget.

Red oak herringbone flooring laid through a doorway with panelled trim and french doors.
Flooring

Herringbone, laid by us

Red oak set in herringbone and run through the doorways without a break. There is no fast way to lay this; there is only the right way.

A finished powder room with basketweave floor tile, beadboard wainscot and a marble-topped vanity.
Tile

Tile, trim and beadboard

Basketweave floor set out from the centre of the room so the cuts land where nobody looks, with the wainscot scribed to meet it.

A built-in cabinet and shelving run with beadboard doors wrapping the corner of a living room.
Built-ins

Built for the wall it lives on

Storage measured to the room rather than to a flat-pack, doors in beadboard to match the trim, and the whole run scribed to the floor.

Want to know who is doing the work?

The crew is the reason the work looks like this. Go and meet them.